90 tasks across 15 departments
Each task has its own form, uses your company documents, and comes with a reviewer checklist. Times are illustrative estimates including review.
Department 01
Quality Assurance
Right-first-time documents and constant audit readiness.
- Draft a new SOP6 h → 2.5 hFirst draft of a new SOP in the company's own format.
- Compare SOP revisions1.5 h → 20 minA change table between two versions of an SOP, with training impact.
- Deviation write-up3 h → 1.2 hStructured deviation report from rough notes, with a 5 Whys outline.
- CAPA status review2 h → 45 minOverdue CAPAs and a suggested effectiveness check for each.
- Change control impact2.5 h → 1 hImpact checklist for a proposed change across documents, validation, training and filings.
- Inspection readiness8 h → 3 hArea checklist mapped to Schedule M and EU GMP, with evidence to keep ready.
Department 02
Quality Control (Lab)
Quicker investigations and more analyst time at the bench.
- OOS investigation outline4 h → 1.7 hPhase I laboratory OOS investigation outline with the checks to perform.
- Trend results (OOT)2 h → 30 minChart of recent results with out-of-trend points flagged against limits.
- Bench method summary1.5 h → 30 minOne-page bench summary of an analytical method.
- Stability data summary3 h → 1 hStability results by condition and time point, highlighting results near specification.
- Calibration schedule2 h → 30 min12-month calibration and maintenance schedule for lab instruments.
- Analyst training quiz1.5 h → 20 min10-question quiz on an SOP or method for new QC analysts.
Department 03
Production
Smoother shifts, cleaner batch records, less paperwork.
- Shift handover summary20 min → 5 minHandover note from the outgoing shift's logs.
- Batch record pre-check1 h → 20 minChecklist to catch missing entries, signatures and calculation errors before QA review.
- Daily production report30 min → 8 minOutput versus plan, yield, deviations and issues for the day.
- Downtime and yield analysis3 h → 45 minMonthly losses by line and product, with the top five losses.
- Weekly production plan4 h → 1.5 hNext week's plan from orders, equipment availability and cleaning times.
- Operator work instructions2.5 h → 50 minSimple step-by-step work instructions in plain English from an SOP section.
Department 04
Regulatory Affairs
Faster, well-referenced submissions and query responses.
- Draft CTD sections8 h → 3.3 hDraft Module 2.3 (Quality Overall Summary) or Module 3 text from development and stability reports, with gaps marked.
- Agency query response5 h → 2 hDraft reply to a regulator's query, quoting the dossier sections relied on.
- Guideline update summary2 h → 30 minWhat changed in a guideline and which products may be affected, with sources.
- Variation assessment3 h → 1 hLikely variation category for a change in a market, and supporting documents needed.
- Label and leaflet comparison2 h → 30 minEvery difference between our leaflet and the reference product's.
- Submission tracker2 h → 30 minTracker of submissions with query due dates and status.
Department 05
R&D and Formulation
Shorter development cycles and better-documented science.
- Literature review10 h → 3 hSummary of recent published studies on an excipient or technique, with sources.
- Patent landscape scan8 h → 3 hPublished patents on a molecule's formulations grouped by approach and expiry.
- Trial batch summary2 h → 30 minComparison of trial batches with a reasoned suggestion on which to take forward.
- Development report8 h → 3 hPharmaceutical development report section from lab notes.
- Tech transfer document6 h → 2.5 hTechnology transfer document outline with process, critical parameters and scale-up risks.
- Design of experiments3 h → 1 hA DoE run table for given factors and ranges, and how to read the results.
Department 06
Validation & Qualification
Protocols and reports ready for review sooner.
- IQ/OQ/PQ protocol draft8 h → 3 hDraft IQ, OQ or PQ protocol from the URS and vendor manual.
- Validation summary report6 h → 2 hSummary report from executed protocol results, with deviations and conclusions.
- Risk assessment (FMEA)4 h → 1.5 hFMEA table with severity, occurrence, detection and controls.
- URS drafting5 h → 2 hUser requirement specification covering GMP, safety and data integrity.
- Requalification schedule3 h → 45 minRequalification schedule from the equipment list and last qualification dates.
- Cleaning validation check2 h → 45 minStep-by-step explanation of a MACO calculation, flagging inputs to verify.
Department 07
Engineering & Maintenance
Less unplanned downtime and reliable utilities.
- Daily work order summary30 min → 8 minOpen and closed work orders summarised for the morning meeting.
- HVAC and water log review1.5 h → 20 minWeekly HVAC and purified-water log summary with excursions flagged.
- PM checklist from manual3 h → 45 minPreventive maintenance checklist from an equipment manual, by frequency.
- Breakdown analysis3 h → 1 hTop failures by equipment with likely root causes.
- Engineering change note2 h → 45 minEngineering change note with reason, impact and qualification required.
- Critical spares planning4 h → 1 hMinimum stock levels for critical spares from consumption history.
Department 08
Supply Chain & Warehouse
Fewer stock-outs, smoother vendor audits.
- Supplier emails20 min → 5 minClear, polite email to a supplier (delivery date, CoA, query).
- Cold-chain shipment check1 h → 15 minTemperature logger summary for a shipment with excursions flagged.
- Weekly supply dashboard3 h → 30 minOpen POs, delays, stock cover in days and key risks.
- Expiry and stock review2 h → 30 minItems expiring within 90 days with suggested actions.
- Vendor qualification pack4 h → 1.5 hChecklist, questionnaire and document list for a new supplier.
- Demand forecast16 h → 5 hNext three months' demand by SKU with seasonal peaks.
Department 09
EHS
Safer operations and complete, timely safety records.
- Job safety analysis3 h → 1 hJSA with steps, hazards, controls and PPE for a task.
- Incident report2.5 h → 50 minStructured incident or near-miss report with causes and proposed CAPAs.
- SDS to shop-floor guide2 h → 30 minOne-page shop-floor guide from a safety data sheet.
- Toolbox talk4 h → 1 h15-minute toolbox talk with five quiz questions.
- Monthly EHS report8 h → 2 hMonthly EHS report from incident, near-miss and inspection logs, with trends.
- Regulation summary3 h → 45 minRequirements of a rule for the site and what must be documented, with sources.
Department 10
Training & HR
Better-trained, audit-ready teams.
- SOP training quiz1 h → 15 min10 multiple-choice questions on an SOP with answers and explanations.
- Simplify work instructions2 h → 30 minRewrite a work instruction in plain, easy English for operators, without changing any requirement.
- Training deck from SOP6 h → 2 h10-slide training deck in simple language from an SOP.
- Retraining matrix update2 h → 30 minWho needs retraining on revised SOPs, and by when.
- Job descriptions1.5 h → 20 minJob description with GMP responsibilities and qualifications.
- Onboarding plan3 h → 45 minTwo-week onboarding plan with SOPs to read and sign-offs.
Department 11
Pharmacovigilance & Medical
Faster, expert-checked safety reviews.
- Case narrative draft1 h → 25 minCase narrative in the company's standard format from de-identified case details.
- Medical information reply1 h → 20 minReply to a healthcare professional's question using only approved product information.
- Literature screening4 h → 1.5 hScreen abstracts for possible adverse event reports and list which need full review.
- Signal trend summary3 h → 1 hCase counts by event and quarter with increasing trends flagged for review.
- Periodic report sections16 h → 6 hCumulative summary section of a periodic safety report from tabulations.
- PV rule updates4 h → 1.5 hRecent changes in pharmacovigilance requirements for a market, with sources.
Department 12
Sales & Marketing
Better-prepared field teams and faster, compliant content.
- Doctor visit planning30 min → 10 minThis week's visit plan for a territory, prioritised by potential.
- Sales performance summary3 h → 30 minMonthly secondary sales by territory and product, explaining the biggest changes.
- Rep product training6 h → 2 hProduct training module for medical reps from the approved prescribing information, with a quiz.
- Promotional material draft4 h → 1.5 hLeave-behind draft using only approved claims and references, for medical-legal review.
- Market and competitor research6 h → 2 hRecent launches and pricing in a therapy area in India, with sources.
- Conference summary4 h → 1 hKey insights for the brand team from conference notes.
Department 13
ESG & Sustainability
Assurance-ready ESG reporting from the data the plant already keeps.
- BRSR section drafter16 h → 5 hDraft BRSR environment, social and governance sections from your data sheets, every figure traced to its source.
- GHG inventory (Scope 1 and 2)8 h → 2 hGreenhouse gas emissions from fuel, generator and electricity data, with a Scope 3 screen.
- Effluent and antibiotic discharge review2 h → 30 minEffluent plant logs against consent limits, with an antibiotic-pollution checklist for antibiotic makers.
- Waste and EPR returns3 h → 1 hHazardous waste, plastic packaging EPR and solvent recovery figures for annual returns.
- ESG questionnaire responder12 h → 4 hAnswers to a customer's or buyer's ESG questionnaire from your policies and data, with gaps marked.
- Green chemistry review4 h → 1.5 hProcess mass intensity and solvent use for a process, with greener alternatives to consider.
Department 14
Engineering Projects
Greenfield and brownfield projects delivered on time, on budget and GMP-ready.
- Project schedule and critical path6 h → 2 hSchedule from activities, durations and dependencies, with the critical path and float.
- Weekly status and RAID log2 h → 30 minWeekly project status report and a log of risks, actions, issues and decisions from meeting notes.
- Vendor bid comparison5 h → 1.5 hTechnical and commercial comparison of vendor quotes against the URS.
- Capex and earned value4 h → 1 hBudget against committed and actual spend, with earned value and a forecast at completion.
- Brownfield shutdown and GMP risk plan12 h → 4 hTie-ins, shutdown windows and contamination control while the plant keeps producing.
- Facility design review and C&Q plan16 h → 6 hGMP review of a new or changed facility design, then the commissioning, qualification and handover plan.
Department 15
MSAT
Robust commercial processes and process knowledge kept through the product's life.
- Process capability3 h → 45 minCpk and Ppk for each critical parameter and quality attribute across batches, with weak spots flagged.
- Continued process verification report8 h → 2 hControl charts for each critical quality attribute across the year, with signals and a conclusion.
- PPQ protocol and report10 h → 4 hProcess performance qualification protocol, or report from executed results.
- Scale-up assessment4 h → 1.5 hLab or pilot to commercial scale, with equipment comparison and scale-up factors.
- Parameter-to-quality analysis4 h → 1 hWhich process parameters move which quality results, across batches.
- Annual product quality review16 h → 5 hCompile batch, deviation, change control, stability, complaint and trend data into the yearly review draft.