GxPilot

90 tasks across 15 departments

Each task has its own form, uses your company documents, and comes with a reviewer checklist. Times are illustrative estimates including review.

Start a free trial

Department 01

Quality Assurance

Right-first-time documents and constant audit readiness.

  • Draft a new SOP
    First draft of a new SOP in the company's own format.
    6 h → 2.5 h
  • Compare SOP revisions
    A change table between two versions of an SOP, with training impact.
    1.5 h → 20 min
  • Deviation write-up
    Structured deviation report from rough notes, with a 5 Whys outline.
    3 h → 1.2 h
  • CAPA status review
    Overdue CAPAs and a suggested effectiveness check for each.
    2 h → 45 min
  • Change control impact
    Impact checklist for a proposed change across documents, validation, training and filings.
    2.5 h → 1 h
  • Inspection readiness
    Area checklist mapped to Schedule M and EU GMP, with evidence to keep ready.
    8 h → 3 h

Department 02

Quality Control (Lab)

Quicker investigations and more analyst time at the bench.

  • OOS investigation outline
    Phase I laboratory OOS investigation outline with the checks to perform.
    4 h → 1.7 h
  • Trend results (OOT)
    Chart of recent results with out-of-trend points flagged against limits.
    2 h → 30 min
  • Bench method summary
    One-page bench summary of an analytical method.
    1.5 h → 30 min
  • Stability data summary
    Stability results by condition and time point, highlighting results near specification.
    3 h → 1 h
  • Calibration schedule
    12-month calibration and maintenance schedule for lab instruments.
    2 h → 30 min
  • Analyst training quiz
    10-question quiz on an SOP or method for new QC analysts.
    1.5 h → 20 min

Department 03

Production

Smoother shifts, cleaner batch records, less paperwork.

  • Shift handover summary
    Handover note from the outgoing shift's logs.
    20 min → 5 min
  • Batch record pre-check
    Checklist to catch missing entries, signatures and calculation errors before QA review.
    1 h → 20 min
  • Daily production report
    Output versus plan, yield, deviations and issues for the day.
    30 min → 8 min
  • Downtime and yield analysis
    Monthly losses by line and product, with the top five losses.
    3 h → 45 min
  • Weekly production plan
    Next week's plan from orders, equipment availability and cleaning times.
    4 h → 1.5 h
  • Operator work instructions
    Simple step-by-step work instructions in plain English from an SOP section.
    2.5 h → 50 min

Department 04

Regulatory Affairs

Faster, well-referenced submissions and query responses.

  • Draft CTD sections
    Draft Module 2.3 (Quality Overall Summary) or Module 3 text from development and stability reports, with gaps marked.
    8 h → 3.3 h
  • Agency query response
    Draft reply to a regulator's query, quoting the dossier sections relied on.
    5 h → 2 h
  • Guideline update summary
    What changed in a guideline and which products may be affected, with sources.
    2 h → 30 min
  • Variation assessment
    Likely variation category for a change in a market, and supporting documents needed.
    3 h → 1 h
  • Label and leaflet comparison
    Every difference between our leaflet and the reference product's.
    2 h → 30 min
  • Submission tracker
    Tracker of submissions with query due dates and status.
    2 h → 30 min

Department 05

R&D and Formulation

Shorter development cycles and better-documented science.

  • Literature review
    Summary of recent published studies on an excipient or technique, with sources.
    10 h → 3 h
  • Patent landscape scan
    Published patents on a molecule's formulations grouped by approach and expiry.
    8 h → 3 h
  • Trial batch summary
    Comparison of trial batches with a reasoned suggestion on which to take forward.
    2 h → 30 min
  • Development report
    Pharmaceutical development report section from lab notes.
    8 h → 3 h
  • Tech transfer document
    Technology transfer document outline with process, critical parameters and scale-up risks.
    6 h → 2.5 h
  • Design of experiments
    A DoE run table for given factors and ranges, and how to read the results.
    3 h → 1 h

Department 06

Validation & Qualification

Protocols and reports ready for review sooner.

  • IQ/OQ/PQ protocol draft
    Draft IQ, OQ or PQ protocol from the URS and vendor manual.
    8 h → 3 h
  • Validation summary report
    Summary report from executed protocol results, with deviations and conclusions.
    6 h → 2 h
  • Risk assessment (FMEA)
    FMEA table with severity, occurrence, detection and controls.
    4 h → 1.5 h
  • URS drafting
    User requirement specification covering GMP, safety and data integrity.
    5 h → 2 h
  • Requalification schedule
    Requalification schedule from the equipment list and last qualification dates.
    3 h → 45 min
  • Cleaning validation check
    Step-by-step explanation of a MACO calculation, flagging inputs to verify.
    2 h → 45 min

Department 07

Engineering & Maintenance

Less unplanned downtime and reliable utilities.

  • Daily work order summary
    Open and closed work orders summarised for the morning meeting.
    30 min → 8 min
  • HVAC and water log review
    Weekly HVAC and purified-water log summary with excursions flagged.
    1.5 h → 20 min
  • PM checklist from manual
    Preventive maintenance checklist from an equipment manual, by frequency.
    3 h → 45 min
  • Breakdown analysis
    Top failures by equipment with likely root causes.
    3 h → 1 h
  • Engineering change note
    Engineering change note with reason, impact and qualification required.
    2 h → 45 min
  • Critical spares planning
    Minimum stock levels for critical spares from consumption history.
    4 h → 1 h

Department 08

Supply Chain & Warehouse

Fewer stock-outs, smoother vendor audits.

  • Supplier emails
    Clear, polite email to a supplier (delivery date, CoA, query).
    20 min → 5 min
  • Cold-chain shipment check
    Temperature logger summary for a shipment with excursions flagged.
    1 h → 15 min
  • Weekly supply dashboard
    Open POs, delays, stock cover in days and key risks.
    3 h → 30 min
  • Expiry and stock review
    Items expiring within 90 days with suggested actions.
    2 h → 30 min
  • Vendor qualification pack
    Checklist, questionnaire and document list for a new supplier.
    4 h → 1.5 h
  • Demand forecast
    Next three months' demand by SKU with seasonal peaks.
    16 h → 5 h

Department 09

EHS

Safer operations and complete, timely safety records.

  • Job safety analysis
    JSA with steps, hazards, controls and PPE for a task.
    3 h → 1 h
  • Incident report
    Structured incident or near-miss report with causes and proposed CAPAs.
    2.5 h → 50 min
  • SDS to shop-floor guide
    One-page shop-floor guide from a safety data sheet.
    2 h → 30 min
  • Toolbox talk
    15-minute toolbox talk with five quiz questions.
    4 h → 1 h
  • Monthly EHS report
    Monthly EHS report from incident, near-miss and inspection logs, with trends.
    8 h → 2 h
  • Regulation summary
    Requirements of a rule for the site and what must be documented, with sources.
    3 h → 45 min

Department 10

Training & HR

Better-trained, audit-ready teams.

  • SOP training quiz
    10 multiple-choice questions on an SOP with answers and explanations.
    1 h → 15 min
  • Simplify work instructions
    Rewrite a work instruction in plain, easy English for operators, without changing any requirement.
    2 h → 30 min
  • Training deck from SOP
    10-slide training deck in simple language from an SOP.
    6 h → 2 h
  • Retraining matrix update
    Who needs retraining on revised SOPs, and by when.
    2 h → 30 min
  • Job descriptions
    Job description with GMP responsibilities and qualifications.
    1.5 h → 20 min
  • Onboarding plan
    Two-week onboarding plan with SOPs to read and sign-offs.
    3 h → 45 min

Department 11

Pharmacovigilance & Medical

Faster, expert-checked safety reviews.

  • Case narrative draft
    Case narrative in the company's standard format from de-identified case details.
    1 h → 25 min
  • Medical information reply
    Reply to a healthcare professional's question using only approved product information.
    1 h → 20 min
  • Literature screening
    Screen abstracts for possible adverse event reports and list which need full review.
    4 h → 1.5 h
  • Signal trend summary
    Case counts by event and quarter with increasing trends flagged for review.
    3 h → 1 h
  • Periodic report sections
    Cumulative summary section of a periodic safety report from tabulations.
    16 h → 6 h
  • PV rule updates
    Recent changes in pharmacovigilance requirements for a market, with sources.
    4 h → 1.5 h

Department 12

Sales & Marketing

Better-prepared field teams and faster, compliant content.

  • Doctor visit planning
    This week's visit plan for a territory, prioritised by potential.
    30 min → 10 min
  • Sales performance summary
    Monthly secondary sales by territory and product, explaining the biggest changes.
    3 h → 30 min
  • Rep product training
    Product training module for medical reps from the approved prescribing information, with a quiz.
    6 h → 2 h
  • Promotional material draft
    Leave-behind draft using only approved claims and references, for medical-legal review.
    4 h → 1.5 h
  • Market and competitor research
    Recent launches and pricing in a therapy area in India, with sources.
    6 h → 2 h
  • Conference summary
    Key insights for the brand team from conference notes.
    4 h → 1 h

Department 13

ESG & Sustainability

Assurance-ready ESG reporting from the data the plant already keeps.

  • BRSR section drafter
    Draft BRSR environment, social and governance sections from your data sheets, every figure traced to its source.
    16 h → 5 h
  • GHG inventory (Scope 1 and 2)
    Greenhouse gas emissions from fuel, generator and electricity data, with a Scope 3 screen.
    8 h → 2 h
  • Effluent and antibiotic discharge review
    Effluent plant logs against consent limits, with an antibiotic-pollution checklist for antibiotic makers.
    2 h → 30 min
  • Waste and EPR returns
    Hazardous waste, plastic packaging EPR and solvent recovery figures for annual returns.
    3 h → 1 h
  • ESG questionnaire responder
    Answers to a customer's or buyer's ESG questionnaire from your policies and data, with gaps marked.
    12 h → 4 h
  • Green chemistry review
    Process mass intensity and solvent use for a process, with greener alternatives to consider.
    4 h → 1.5 h

Department 14

Engineering Projects

Greenfield and brownfield projects delivered on time, on budget and GMP-ready.

  • Project schedule and critical path
    Schedule from activities, durations and dependencies, with the critical path and float.
    6 h → 2 h
  • Weekly status and RAID log
    Weekly project status report and a log of risks, actions, issues and decisions from meeting notes.
    2 h → 30 min
  • Vendor bid comparison
    Technical and commercial comparison of vendor quotes against the URS.
    5 h → 1.5 h
  • Capex and earned value
    Budget against committed and actual spend, with earned value and a forecast at completion.
    4 h → 1 h
  • Brownfield shutdown and GMP risk plan
    Tie-ins, shutdown windows and contamination control while the plant keeps producing.
    12 h → 4 h
  • Facility design review and C&Q plan
    GMP review of a new or changed facility design, then the commissioning, qualification and handover plan.
    16 h → 6 h

Department 15

MSAT

Robust commercial processes and process knowledge kept through the product's life.

  • Process capability
    Cpk and Ppk for each critical parameter and quality attribute across batches, with weak spots flagged.
    3 h → 45 min
  • Continued process verification report
    Control charts for each critical quality attribute across the year, with signals and a conclusion.
    8 h → 2 h
  • PPQ protocol and report
    Process performance qualification protocol, or report from executed results.
    10 h → 4 h
  • Scale-up assessment
    Lab or pilot to commercial scale, with equipment comparison and scale-up factors.
    4 h → 1.5 h
  • Parameter-to-quality analysis
    Which process parameters move which quality results, across batches.
    4 h → 1 h
  • Annual product quality review
    Compile batch, deviation, change control, stability, complaint and trend data into the yearly review draft.
    16 h → 5 h